Federal Minister for Energy Omar Ayub has talked about that there isn’t any such factor as a reply to the load shedding in Karachi for two years because of the ability transmission system can’t bear the extra load.

Speaking inside the National Assembly, he talked about that the federal authorities was ready to provide additional vitality to Karachi nevertheless Ok Electric did not have a system to receive additional vitality.

The federal minister instructed the assembly that Ok Electric had promised to assemble a model new system by 2022. Until then, the surplus vitality cannot be added to {the electrical} system.

He talked about that the federal authorities is providing additional gas, additional electrical vitality, and additional furnace oil to Ok electrical.

Karachi Electric Company says that restore work inside the affected areas is being delayed due to the accumulation of rain water.

After the rains, many streets of Gulshan-e-Hadeed, Surjani, North Karachi, Nazimabad and, Saddar flooded.

Moreover, after the event inside the local weather inside the metropolis, the demand for electrical vitality has come down from 3,000 to 2,800 MW.

Despite the gap between the demand and supply of electrical vitality being 200 MW, the ability present situation has not improved.

LEAVE A REPLY

Please enter your comment!
Please enter your name here