67 / 100

The gas catastrophe may make life strenuous for Pakistanis notably people who uncover it tougher to brave chilly temperatures by the winter season as Sui Southern Gas Company has warned of gas shortage up ahead.

Commercial and residential prospects of gas usually get severely affected by the shortage all through winters yearly as a result of it makes it robust for them to arrange dinner meals.

A spokesman for the Sui Southern Gas Company (SSG) said the gas catastrophe might be moreover refined inside the winter.

A spokesman for Sui Southern Gas Company said that each one stakeholder, along with Okay-Electric, has been notified regarding the concern.

He said that Sui Gas in Sindh would face a shortfall of 300 million cubic toes per day MMCFD.

A spokesman for Sui Southern said that there was a reduction in gas stress from the gas topic and the SSGC had a shortfall of 150 MMCFD.

 The shortfall has affected the scenario of the linebacker (amount of gas which may be “stored” in a gas pipeline.)

An SSG spokesman said the amount of gas from totally different gas fields was moreover declining. 

The Sinjhoro and Zarghun gas fields are closed attributable to annual repairs.

ALSO, READ

A Sui Southern spokesman said Okay Electric is being provided with the provision gas at 190 to 200 MMCFD. SSG Spokesman moreover said that the load administration course of laid down by the federal authorities was being adopted.

A spokesman for Electric said the shortfall had affected the scenario of the highway pack, together with that delivering gas to residence buyers was one in every of many prime priorities.

The sole power distributing company in Karachi would require repairing its manufacturing crops using the furnace oil sooner than the arrival of the winter season to have the ability to stay away from the shortage of {the electrical} power period.

Letter To SSGC

Okay, Electric earlier wrote a letter to the Sui Southern Gas Company requested them to increase the gas present and stress to the Okay-Electric’s crops.

The letter addressed to the SSGC was to enchantment for continued gas present and stress for the power crops to make operational.

Diamer-Bhasha Dam Project

On the alternative hand, the Water and Power Development Authority WAPDA has begun the recruitment of the Grade-6 to Grade-16 officers for the making of the Diamer-Bhasha Dam.

LEAVE A REPLY

Please enter your comment!
Please enter your name here